Pier 17 Floating Dock

DETAILS

PROJECT LOCATION

Pier 17, San Diego Bay

PROJECT DATE

2012-10-15

KEY FEATURES

Consulting, Design, Planning, Construction Project Management

Project Overview

Triton Engineers completed upgrades to Driscoll’s Wharf deck with no new piles through the innovative design of a prefabricated steel bridge to replace deteriorated pile bents. 

The improvements designed by Triton Engineers helped save the Port of San Diego thousands of dollars in project and construction costs.