Project Description

Triton engineered the design-build of a structurally reinforced 100,000 sq. ft concrete working slab to support shipyard production in San Diego (CA). The slab was constructed in an area of the shipyard previously occupied by old buildings which were dismantled. Value: $7,209,278  

Project Details

Article Date 08/25/2006 Categories Waterfront
Completed June 2007Client General Dynamics NASSCO