Performed installation engineering for the installation of two large diameter high density polyethylene (HDPE) pipelines in Cayuga Lake. Prepared pipeline deployment plan for installation of over 10000 ft of 63 inch diameter intake pipeline in 250 ft water depth and 800 ft of 48 inch outfall pipeline.