Dry Dock Scuttling

Home / Dry Dock Scuttling
  • Dry Dock Scuttling
  • Dry Dock Scuttling
  • Dry Dock Scuttling
  • Dry Dock Scuttling
  • Dry Dock Scuttling
  • Dry Dock Scuttling
  • Dry Dock Scuttling

Project Description

Scuttling of 540 ft x 130 ft drydock structure for BAE Systems in Long Beach, CA. This project included complete planning, engineering analysis, managment, and labor in order to safely remove a dry dock structure from the South West Marine facility in San Pedro, CA. The structure was towed a minimum distance of 12 miles […]

Project Details

Article Date 08/25/2008 Categories Marine & Underwater
Completed September 2005Client BAE Systems, San Diego Ship Repair